Team performing quality measurement and safety checks on railway track

Quality Policy

POL02
Our policy

We manage safety and quality within one field system.

Raylı sistem hattında ölçüm ve kalite kontrolü yapan saha ekibi

At Uzay Ray Demiryolu, safe work and measurable quality are not separate delivery topics; they are integral parts of one process from survey to site acceptance.

01EHS system

Occupational Health
and Safety

In rail-system works, moving equipment, power lines and operational conditions are assessed together. With a zero-accident goal, we identify risks before work begins, document field checks and apply safe working methods without exception.

  • We plan track closures, energy isolation and site-access rules specifically for each job.
  • We document daily risk assessments and pre-work checks.
  • We enforce personal protective equipment and safe equipment use without exception.
  • We continuously improve team competence, training and field communication.
02Quality system

Measurable
Quality

We assess quality not only by the appearance of the completed track, but through measurement results, welding records, material traceability and handover documentation.

  • We apply measurement and inspection plans that meet technical specifications and tolerances.
  • We verify welding, installation and maintenance steps with traceable field records.
  • We address nonconformities at their source and track corrective actions through closure.
  • We prepare complete handover files with measurement, test and execution records.
Field standard

Inspection, documentation and continuous improvement.

Every operation follows the same verification chain.

01PlanRisk and quality plan
02ExecuteCompetent team and correct equipment
03VerifyMeasurements and field records
04ImproveFeedback and follow-up

Every shift follows the same objective: start safely, execute correctly and deliver with verified quality.