Sabiha Gökçen Metro Line Superstructure Works
Project portfolio
Rail Superstructure Works

Sabiha Gökçen Metro Line Superstructure Works

StatusCompleted
LocationIstanbul, Türkiye
Execution year2020–2021
ScopeRail Superstructure Works
Project scope

Controlled execution planned around field requirements.

Rail superstructure works for the Sabiha Gökçen Metro Line Project were successfully completed. A total of 15,400 metres of track was installed, together with 8 stations and 12 railway switches.

This major strategic project was delivered in 10 months. Project period: June 2020 – April 2021.
Delivery approach

From technical scope to verified handover.

We manage every field operation through the same traceable workflow.

01
SurveyField data and needs analysis
02
PlanningMethod, team and schedule
03
ExecutionControlled field work
04
HandoverMeasurement, records and verification